Due to a power surge, several light switches in our sanctuary were damaged, leaving us with only one operational way to turn the sanctuary lights on/off. If this switch fails, we will be without lighting in those areas.
As a result, upgrading the church lighting system will become the next priority of the Project-Based Giving Fund. The lighting system is original to the building, and the electrical components, wiring, and installation require a complete upgrade to meet current safety standards and building codes.
This will be a significant investment, but it is necessary to ensure the safety, reliability, and long-term functionality of our church facilities.
Thank you for your continued support of the Project-Based Giving Fund as we preserve and improve our church home.
total amount collected to date: $1280.00